Our track record /
Projects delivered across power, energy & infrastructure.
Since 2010, CVISL has delivered substation construction and rehabilitation up to 330kV, GIS and cable repairs, distribution networks, site development, geotechnical investigations and building works for TCN, Siemens Energy, NDPHC and NUPRC, directly and alongside leading EPC contractors.
Construction / Renovation / Upgrade of NUPRC Lagos, Akure, Benin and Warri Regional Offices
Awarded by the Nigerian Upstream Petroleum Regulatory Commission (NUPRC) following competitive tender under the Public Procurement Act 2007. Lump-sum contract covering full construction, renovation and building services upgrade of four regional offices.
OngoingOn site /
Our work in pictures
Photos from CVISL project sites: substation equipment, cable works, distribution lines and our engineers in the field. Tap any photo to enlarge.









Ongoing /
Current projects
Construction / Renovation / Upgrade of NUPRC Lagos, Akure, Benin and Warri Regional Offices
Client: Nigerian Upstream Petroleum Regulatory Commission (NUPRC)
Construction · Renovation · Building Services Upgrade
Construction of 2 X 60 MVA 132/33kV Substation at Birnin Kudu and 2 Nos 132kV Line Bay Extension at Dutse, Jigawa State
Client: Sanrouk Engineering Services (Main Contractor) for TCN
Engineering & design · Sergi transformer fire protection · Steel structures · Control & relay panels (NR) · FAT & training · Testing & commissioning
Construction of 2 x 60 MVA 132kV Substation at Bichi, Kano State
Client: Sanrouk Engineering Services (Main Contractor) for TCN
Engineering & design · Sergi transformer fire protection · Steel structures · Control & relay panels (NR) · FAT & training · Testing & commissioning
CBN facility for DISCO Franchise Electricity Network Investment Program (DISCO-ENIP) for Accelerated Transmission-Distribution Interface SLA Projects: EKEDE/SS-1/Akoka
Client: Maiwada Global Concepts Ltd (CBN DISCO-ENIP)
Engineering · Procurement · Construction · Testing & commissioning
Construction of 2 X 60MVA, 132/33kV Substation at Ede with 2 X 132KV Line Bays Extension at Oshogbo
Client: Transmission Company of Nigeria (TCN)
Engineering · Procurement · Construction · Testing & commissioning
Completed /
Completed projects
Additional Works at Abeokuta
Client: Siemens Energy
Additional Preliminary/Site Works
Alagbon PPI Batch 2 – Soil Investigation and Laboratory Testing
Client: Siemens Energy
Soil Investigation and Laboratory Testing
Supply and Installation of Porta Cabins to Offa & Sokoto
Client: Siemens Energy
Supply of Porta Cabins · Logistics to site · Installation
Soil Investigation Tests at 7 Sites (Group 2 & 3)
Client: Siemens Energy
Soil Investigation and Testing
Emergency Repair of vandalised 132kV underground cable, comprising Cable Jointing Kits for 1 x 400 mm2 /72 Diameter Copper XLPE Armoured Cable
Client: Transmission Company of Nigeria (TCN)
Inspection & diagnosis · Procurement · Import & delivery to site
Preliminary Works at Abeokuta proposed 330/132/33kV SS
Client: Siemens Energy
Site clearing · Temporary Fence · On Site Facilities
Soil Resistivity Tests at Offa & Sokoto
Client: Siemens Energy
Soil Resistivity Testing
Construction of 33kV & 11kV Lines and 8 Nos 500KVA Distribution Transformers at Okitipupa, Ondo State – Lot 12A.
Client: Niger Delta Power Holding Company (NDPHC)
Survey · Foundation · Installation/erection · Testing & commissioning
Repair of Faulty Voltage Transformer at Central Business Area ABB 132kV GIS Substation with new Trench GIS VT
Client: Transmission Company of Nigeria (TCN)
Inspection & diagnosis · Engineering team mobilisation · Repair works · Testing & commissioning
NGP – T4- Lot 2 – Rehabilitation & Retrofitting of 330/132/33kV SS – 2 x 150 MVA with 100MVA reactor at Kano, Kano Estate, 2 X 60-66MVA with 6 Nos. of 33kV outgoing bays at Billari, Gombe State, Rehabilitation of 2 X 45MVA by 1 X 60-66MVA at Zamfara in Gusau State
Client: Seacof Engineering (Main Contractor) for TCN
Port clearance · Logistics to site · Foundations & cable trenches · Equipment erection · Testing & commissioning
NGP – T1 – Lot 3 – Rehabilitation & Retrofitting of 330/132/33kV SS – 3 x 60 MVA at Oshogbo, Ayede and Ijebu Ode
Client: Fedders Lloyd Corp. (Main Contractor) for TCN
Port clearance · Logistics to site · Foundations & cable trenches · Equipment erection · Testing & commissioning
NGP – T1- Lot 4 – Rehabilitation & Retrofitting of 330/132/33kV SS – 2 x 60 MVA at Mando Road & Dan Agundi (Kano)
Client: Fedders Lloyd Corp. (Main Contractor) for TCN
Port clearance · Logistics to site · Foundations & cable trenches · Equipment erection · Testing & commissioning
NGP – T11 – 2 x 60 MVA Mobile Substations – 132/33kV – Alagbon
Client: Fedders Lloyd Corp. (Main Contractor) for TCN
Port clearance · Logistics to site · Foundations & cable trenches · Equipment erection · Testing & commissioning
Want the full details?
Download our company profile for certifications, project pictures and our complete project list, or contact us for references.